Get In Touch
Location
2301 NW 109th Ave, Ste 100
Miami, FL 33172
  • LinkedIn
  • Facebook
  • Instagram

Data Center Plant Renovation

vault-data-center-1

Central Plant Renovation

The servers within a data center have extremely stringent requirements for cooling.

Any failure of the Mechanical system can cause millions of dollars in damage and lost data. The challenge for this project was to replace the Fluid Cooler system while eliminating potential downtime. With the use of Temporary Cooling and Pipe Freezing, Tropic was able to successfully develop and execute a 7 phase plan to replace these Fluid Coolers with absolutely zero downtime, not a single second of lost cooling was experienced by the center.

Value
$1 Million
Completed
March, 2009